在India,加班從一天工作滿 9 小時之後開始,一週則從滿 48 小時之後開始,並以正常單價的 2 倍支付。

每日加班起點
9 小時
每週加班起點
48 小時
加班倍率
每週工時上限
60 小時
休息時間
30 分鐘 · 5 小時

When overtime starts in India

The daily threshold is 9 hours and the weekly threshold is 48 hours. Hours worked beyond either point count as overtime and are paid at 2× the regular rate.

Where a figure is not shown, India does not set that threshold nationally, or it is left to a collective agreement. Check the source before applying it to a specific contract.

Maximum weekly hours

The maximum working week in India is 60 hours, including overtime. Averaging arrangements over a reference period are common and may change how the limit applies to any single week.

Rest breaks

A rest break of at least 30 minutes applies once a shift exceeds 5 hours. Unpaid breaks are excluded from paid hours, which is how the hours calculator treats the break field by default.

Calculate overtime pay for India

Select India in the hours calculator or the timesheet and these thresholds and the 2× multiplier are applied to your week automatically. Overtime hours are shown on their own line rather than folded into the total, so the figure can be checked against the statute.

出處:labour.gov.in

更新至 2026年9月21日

本頁整理India的法定基準,僅供一般參考。它不是法律意見,團體協約與業別規定可能訂有不同條件,勞動法令也會修正。引用任何數字之前,請先查核 labour.gov.in。

常見問題

When does overtime start in India?

After 9 hours in a day or 48 hours in a week, whichever is reached first. Hours beyond that point are overtime.

How much is overtime pay in India?

Overtime is paid at 2× the regular hourly rate under the rule cited on this page. Collective agreements may set a higher rate.

What is the maximum number of hours per week in India?

60 hours including overtime, subject to any averaging or sector exceptions that apply in India.

Are rest breaks required in India?

A break of at least 30 minutes is required once a shift passes 5 hours. Whether it is paid depends on the contract.